Development has commenced on Ramp 02 with the installation of structural formwork and high-tensile steel reinforcement. This stage is critical for defining the ramp’s geometry and ensuring long-term load-bearing capacity. Our engineering team is conducting rigorous inspections of the rebar spacing and formwork stability to ensure the structure is fully prepared for the upcoming concrete pour.


Construction
13 March 2024
On Cloud Nine
Wellawatte, Colombo